6. SHIPBUILDING — THE LARGEST LOSER

Shipbuilding and Conversion, Navy:

&#036;60.18B requested → &#036;41.64B proposed.

A reduction of &#036;18.54B, or 30.8%.

The most significant change is the introduction of incremental funding for seven shipbuilding and overhaul projects.

Instead of funding most of their costs upfront in FY2027, approximately &#036;14.95B is deferred into subsequent budget years.

Deferred FY2027 funding:

 Columbia-class SSBN: −&#036;5.61B. One ballistic-missile submarine remains planned, but less of its cost is funded this year.

 Two Virginia-class SSNs: −&#036;4.62B. Both attack submarines remain planned, with payments spread across multiple years.

 LHA amphibious assault ship: −&#036;1.60B. Procurement continues under incremental funding.

 CVN-75 Truman refueling overhaul: −&#036;1.60B. Nuclear refueling and modernization of the existing carrier, not construction of a new carrier.

 LPD Flight II: −&#036;875M. An amphibious transport dock ship remains planned.

 FF(X) frigate: −&#036;643M. Funding for the new frigate is spread across future budgets.

Immediate funding for these projects is reduced, shifting financial obligations into later years.

Other shipbuilding reductions:

 Submarine tenders: −&#036;4.44B. Both planned vessels are removed from the FY2027 procurement proposal. These are maintenance and support ships for submarines.

 BBG(X): −&#036;1B. Advance procurement for the proposed battleship is eliminated, but the program itself is not formally canceled.

 Bulk fuel vessel: −&#036;450M. Procurement removed from the current budget.

 Ship-to-Shore Connectors: approximately −&#036;167M net. The vessels transfer personnel and equipment between ships and shore.

 Submarine industrial base: &#036;1.1B reduction to an existing funding allocation, with industrial investments reorganized into separate accounts.

Shipbuilding increases:

 DDG-51 Flight III: +&#036;1.90B. A second Arleigh Burke-class destroyer is added, increasing the proposed FY2027 buy from one to two.

 Surface Ship Industrial Base: +&#036;595M. Investment in shipyards, suppliers and production capacity.

 Submarine Industrial Base: &#036;1.78B in a separate funding line, largely from transfers, including approximately &#036;329M for identified new industrial investments.