**Rail traffic on the Crimean Bridge restored**

All delayed Tavria trains have arrived in Kerch. The Grand Service Express reports that railway movement across the bridge has resumed.

Remaining Tavria services for 19 November and beyond are scheduled to run on time with unchanged departure times. Agreed bus transfers from Sevastopol, Simferopol, Vladislavovka and Sem Kolodezey to Kerch are operating according to schedule.

[@Slavyangrad](https://t.me/Slavyangrad)