HAL CMD Ravi K.

Defence Squad

Defence Squad

@DSquadOfficial

✅Official Channel of Defence Squad 📲 The Super App | Download Now : https://bit.ly/DefenceSquadApp 🔹YouTube : https://m.youtube.com/c/DefenceSquad 🔹 Instagram : https://www.instagram.com/defencesquad/ 🔹Twitter : https://twitter.com/Defence_Squad_/

83,254 مشتركًا
فتح في تيليجرام
HAL CMD Ravi K. said the Tejas MK1A delay is linked to radar-related issues and ongoing certification/testing, rather than weapon integration.
🔹 Weapon integration is largely complete
🔹 Additional tests are required to validate how the aircraft and its structure behave after missile firing
🔹 These tests are part of the certification process
🔹 HAL says other major tests, including firing trials, have been completed
فتح المنشور في تيليجرام