The pictures compare two road tunnels in different Australian urban areas. Overall, two tunnels differ in several respects; tunnel A is older, narrower and shorter, whereas the other one is a much more recent construction, being larger in dimensions and more expensive. Another notable feature is the location, with one running beneath a river and the other beneath a highway.
The first tunnel is the older of the two. It was built between 1987 and 1992, a construction period of five years, which came at a cost of $556 million. It is shorter and lower than its counterpart, stretching 2.2 kilometres in length and rising 25 metres in height. The tunnel’s twin tube allows two vehicles to pass through at the same time, side by side. Since the tunnel lies under a river, it is surrounded by sand, clay and concrete slabs from both above and below to ensure safety.
By contrast, tunnel B, located in another Australian city, is more modern. It was constructed from 2004 to 2007, requiring a shorter time span to complete and costing double the amount spent on building tunnel A, at $1.1 billion. It is also wider and longer, accommodating three lanes of traffic, with a length of 3.6 kilometres and a height of 35 metres. This tunnel runs beneath the city’s motorway, so its foundantions consist of natural rock.
#report
#classwork
The pictures compare two road tunnels in different Australian urban areas.
Nozima Qadamova | 9.0
@nozima_writesListening/Reading 9 Writing/ Speaking 9 IELTS 9 To register for offline courses @nteacher_check No advertising service available!
14,215 مشتركًا
فتح في تيليجرام 